The greenhouse construction site should be free of large stone cuts, underground pipelines, underground facilities and other obstacles within a depth of one meter underground. The construction party shall carry out five connections and one leveling work in accordance with the requirements of greenhouse construction, namely, water, electricity, roads, telephones, drainage, leveling and compacting the site. Before obtaining the geological description or survey report of the site, the construction unit shall temporarily design and make a rough estimate according to the standard value of the allowable bearing capacity of the bearing soil layer ≥80kpa and the underground stable water level of ±0.000 below 1m. The buried depth of the independent point foundation is about 0.5m below ±0.000, and an independent foundation is used inside the greenhouse; a 0.5-meter-high brick wall skirt is set around the greenhouse, of which about 0.5m below ±0.000 and 0.50m above ±0.000. Anchor bolts are embedded on the top of the foundation and foundation beam to connect the upper structure columns, and cement mortar is applied inside and outside the wall skirt; 80cm wide concrete water spills are set around the outside of the greenhouse; drainage ditches are installed outside the greenhouse water spill facilities. The drainage ditches around the greenhouse are built by the owner. The design shall refer to the national standard "Code for Design of Building Foundations" (GBJ50007-2002). If the geological description provided by the builder does not match the actual situation (such as the survey report), the design calculation and budget of the greenhouse foundation shall be adjusted accordingly.
Structure of indoor vegetable greenhouse
May 06, 2024
Send Inquiry






